
At Abel Eppensstraat and Nicolaas Westendorpstraat in Appingedam, 39 energy-efficient apartments are being built on behalf of Groninger Huis. The 42 existing homes were demolished using circular demolition methods in August 2024.
A distinctive technical feature of the project is the fully circular façade system using dry-stacked, handmade facing bricks. The Click Brick units are mechanically secured with clips, without the use of traditional masonry mortar. This creates a demountable façade construction, allowing materials to be more easily reused in the future.
A dry-stacked façade system places different and more demanding requirements on lintels and masonry support angles than traditional brickwork. Precise engineering and detailing of the masonry support system are therefore essential. Atko provides technical advice and support to achieve a technically suitable and practical solution.